Different can’t be the Same

If a city tells you the grades must be re-worked to reduce the maximum slope from the center line in the street it means what was previously drawn as asphalt removal will change. It can’t stay the same otherwise it will be the same and not even begin to address city comments. So if true why did I hear back both from the PM and the Super that it was the same. Why does the most obvious sometimes seem so difficult. Well lack of common sense and logic is painful to my brain.

Comments
Leave a reply

You must log in to post a comment

Fonts by Google Fonts. Icons by Fontello. Full Credits here »